When EnCana hired a large firm to design and build their Water Treatment Facility, they expected a quality facility to be commissioned and running on time. With this environmentally friendly complex water process facility comes complicated process control systems and extensive electrical instrumentation and controls. The facility is imperative for EnCana’s operations to run under EPA permitting guidelines. It became apparent that the project would not be completed on-time, thus impacting production and hitting the bottom line. EnCana and ITC then partnered to work with engineering groups on both sides and developed strategies to expedite completion and keep the already over-budget project on track.